|
Raw Garbage Boil & Dry for Livestock Feed Plant
|
A large scale plant is assembled in a compact design, and functions without producing cooking broth or waste water.
|
Raw garbage in the hopper is automatically fed through to the Cyclone Dryer. in which the loaded matter is treated under the boil & dry process. Then the dried material is conducted to a refining device in which the material is processed into powdery particles and also foreign substances are segregated. After the refining stage, the material is subjected to a high temperature in the heat sterilizer at 133 deg. C. for 20 minutes, according to international standards for high-temperature sterilization. The sterilized material is then moved to an oil extractor (expeller), which reduces fat/oil down to 10% for the finished product i.e. high quality livestock feed.
|
|
Solid Picture
|
|
Flow Chart
|
|
Model
|
Capacity (ton/day)
|
Capacity
(kg/h)
|
Fuel
Consumption
(l/h)
|
Total
Electricity
(kw)
|
Power
Consumption
(kwh)
|
Running
Cost
for 1ton of raw garbage
(Yen/ton) |
Plant
Space
(m2) |
SD-1200
|
2.2
|
90 |
8.6
|
64
|
32
|
7,200
|
4x8
(32m2)
|
SD-1500
|
3.6
|
150 |
14.4
|
80
|
40
|
6,300
|
4.5x9
(40m2)
|
*Capacity subjects to 24hrs operation
|
|