-
-
- Industrial Waste Intermediary Treatment
-
Industrial Waste Intermediary Treatment
Livestock Excreta
Boil & Dry Non-Odor Compost Plant
Boil & Dry process treats livestock excreta without smell and waste water, and makes compost in high speed maturity.
- Possible to treat even those excreta with 95% of water content.
- Duration of the fermentation for maturity is in 20 days, 1/5 for the traditional method.
- The required space is only 218 m2 with the treatment of 10 tons/day, and 1/15 for the traditional method.